Electronics And Air Conditioning Installed In Shipping Container Home

Finally the air conditioning is finished and running also helps maintaining a constant temperature with the front door also being installed even though still minus its handle. Wiring has also been completed in the apartment at least. Still need to get on with caulking and painting the skirting boards before the kitchen cabinets can go in. Hopefully all this will be done by the end of the month.

intelligent light switch
After reading about a smart home system in Popular mechanics I decided to go ahead and install the system in my home by replacing some of the lighting switches around the house. Instead of having a single switch the system uses multiple switching where the switches communicate with each other around the house. Things like being able to turn on and off the garage lights from the sitting room as well as the outside lighting from the sitting room. At the same time the system also allows all the lights to be rigged to one switch so you can switch all the lights off when going out, Pretty smart stuff.

Showers And Electronics For The Shipping Container Home

Not everything runs smoothly and having the microwave mounted on its brackets ready to go, plugged it in and nothing! A quick call to Best Buy and a replacement was ordered for next Wednesday giving me two delays on the project as the kitchen cabinet parts are still due from Ikea.

faulty microwave 
When I thought about tiling myself I wasn’t too keen on doing it even with instruction from a friend who is a tiler. Surprising though once the first one went on everything fell into place and by the following day it was ready to grout. It also depends how fussy you are and how much attention you put into preparation for the grout. I made sure that after tiling the cracks were free of any excess adhesive and that there was none left on the tile faces. Although once done it means you get a really good finish when you grout as there is no residue from the tile fixing to spoil it. Next job shower door and glass.

newly tiled shower
After nearly a month of rain I am hoping we can get the water and sewer trenches finished as it looks like next week is going to be dry. Then its on to the plumber doing final connections and the home is ready to move in.